We specialize in producing high-strength, consistent concrete mixes for basement floors. Our expertly calibrated blend ensures optimal durability, moisture resistance, and a smooth finish, providing a solid foundation for your home improvement projects.
Solid Foundations for Your Peace of Mind
Call us at: 630-474-5325
We follow industry best practices to measure, mix, and pour concrete for basement floors, ensuring the correct water-to-cement ratio and ideal curing conditions for a smooth, durable surface.
We evaluate your basement dimensions and required floor thickness to calculate precise cement, aggregate, and water quantities for the ideal mix design.
We combine cement, sand, and gravel in appropriate proportions, blending them thoroughly before adding water to ensure consistent distribution of materials.
Next, we slowly introduce water and any necessary admixtures like plasticizers or waterproofing additives, adjusting the mix to achieve the right workability and strength.
The concrete is poured into place and spread evenly using trowels and screeds, followed by a float finish to ensure a smooth, level surface ready for curing.
Our precise mixing and professional pouring processes deliver basement floors that resist cracking, moisture infiltration, and wear, providing lasting protection and value for your property.
Timely delivery and setup of ready-mix concrete so your project stays on schedule.
Certified professionals with years of experience producing and pouring high-quality basement concrete.
Transparent quotes and competitive rates—no surprises, just value and quality.
Our team provides on-site support during your pour to ensure smooth operations and answer any questions.
Contact us to discuss your project requirements and receive a customized concrete mix plan.
The mix arrived on time and performed exactly as promised. My basement floor cured perfectly and looks great – highly recommend!
Homeowner
The concrete arrived exactly as mixed, and the pour was seamless. We’re thrilled with the floor’s strength and finish.
Contractor
Exceptional mix design and delivery service. The team helped me choose the right blend, and the result was perfect on the first pour.
Builder
Find answers to your most common questions about concrete mix design, delivery, and pouring techniques here.
A concrete mix ratio defines the proportion of cement, sand, gravel, and water used to create concrete, impacting its strength, workability, and curing performance.
These mixes are ideal for basement floors, including finished living areas, utility spaces, garages, and storage rooms.
Pours typically take a day, with finishing completed within hours; initial curing takes 24–48 hours, and full strength is reached in 28 days.
Properly mixed and cured concrete provides a long-lasting floor that resists cracking and moisture, although extreme conditions may require maintenance over time.
Using the correct mix ratio and curing practices minimizes cracking and surface imperfections, ensuring a smooth, uniform finish.